Programme : Indoor playground, restaurant, swimming pool
Zoning district : Natural green district/ natural settlement district
Site area : 2852 sqm
Building area : 508 sqm
Gross floor area : 753 sqm
Exterior finishing : brick/ extruded cement panels/ painting on galvanized steel sheet/ bangkirai
Interior finishing : painting on plaster board/ bangkirai/ rexcourt/ oak glulam/ marble
Total construction cost : 1,200,000,000 won
Design period : Aug. 2012 – Sep. 2013
Construction period : Feb. 2013 – Dec. 2013
© Rohspace . Published on December 17, 2014.
Credits
Design team : Shin Hosub, Shin Kyungmi, Hong Jaesung, Eom Jiwoo, Shin Sooho
Model work : Sung Nammi, Lee Sera
Civil engineer : Daehan Survey Design Corp.
Structural engineer : Kim and Lee Structure
Mechanical engineer : Seoul ENC
Electrical engineer : Seonin Engineering
Play facility design : SHIN architects
Graphic design : Studio Hertz
Construction : Dasan Construction & Engineering Co., Ltd
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.
© Rohspace . Published on December 17, 2014.