EUROPAALLEE 21. Freischützgasse House - David Chipperfield Architects

$
0
0

Europaallee is expanding. The major bank UBS AG has already relocated to the new building, named Europalle 21, situated beside Zurich’s main train station and its university of teacher education. Three renowned european architectural firms have designed the ensemble of four buildings: MAX DUDLER, ANNETTE GIGON / MIKE GUYER ARCHITECTS and DAVID CHIPPERFIELD ARCHITECTS
See all buildings of Europalle 21 ensemble

02_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

The urban plan for the site between Zurich’s Lagerstrasse and the track bed, to which Europaallee 21 belongs, dates back to a two-stage study commissioned by SBB AG in 2006 that Max Dudler won. On Max Dudler’s initiative, the competition’s runner up – the consortium Annette Gigon / Mike Guyer Architects and David Chipperfield Architects – was invited to collaborate on the development of Construction Site C based on the winning competition design. The UBS complex comprises four buildings, grouped like windmill sails around a public courtyard accessible from four sides. The individual buildings are connected by bridges to form a unified whole. Max Dudler designed two of the buildings, the remaining two being designed by David Chipperfield Architects and Gigon/Guyer Architects respectively. The collaborative nature of the new ensemble – the result of close cooperation between the three architectural firms – is in keeping with the major bank’s own image.

12_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

UBS’s representative offices will be in Europaallee 21 of central Zurich’s new Europaallee district. Following Kees Christiaanse’s masterplan, this district is being developed alongside the narrowed tracks of Zurich’s main train station. Europaallee 21 is situated between Lagerstrasse and the track bed. Construction Site A lies to the east, and Construction Site E to the west. The planned completion date for the new Europaallee district is 2020. The new district will incorporate 6 000 workplaces, 2 500 study spaces, 300 apartments, one hotel, shops and restaurants as well as other leisure activities. On Construction Site A, Europaallee Quarter’s first new edifice, completed in autumn 2012, was a four-building ensemble by Max Dudler, which houses Zurich’s University of Teacher Education, as well as a shopping mall and offices. Prior to the decision to develop the tract of land in 2006, the area was being used by the Swiss Federal Railways and the Swiss Postal Service and was not accessible to the public.

13_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

Freischützgasse House, the new eight-storey building designed by David Chipperfield Architects, occupies the north-east corner of the site. The narrow front end opens onto the new Europaallee, while its long side extends along Freischützgasse. The strict rationality of its floor plan, also reflected in its façade, is softened by the floor-height facade bands which meander in opposing directions. The resulting bas-relief effect is further enhanced by printed synthetic mesh with different levels of perforation in the external glass panels. The appearance of the building changes depending on the prevailing light and viewing angle. In its perception it oscillates between heaviness and lightness, austerity and playfulness, enclosure and openness and in doing so enters into a lively dialogue with its surroundings.

14_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

On the ground floor, the entrance lobby creates a link between Freischützgasse and the inner courtyard. Two storeys in height, the lobby offers views into the first floor offices as well as the communal corridor. This generously-proportioned corridor, facing the inner courtyard, connects all four office buildings at first floor level. Bridge areas on all the other floors enable direct access to the adjoining buildings. The new building’s interior is defined by its rational floor plan, which provides a maximum degree of flexibility through column-free spaces. The bay-like niches set into the building’s façade afford attractive views across Europaallee boulevard, as well as into the publicly accessible inner courtyard.

Building volume
Gross floor area: 14 600 m2
Gross building volume: 54 700 m3
Summary
Ground floor with entrance hall and conference rooms, external restaurant, office space on seven floors

15_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

EUROPAALLEE 21 BUILDING ENSEMBLE
Building volume
Site surface area: 7 400 m2
Gross floor area: 56 700 m2
Gross building volume: 213 000 m3

Competition
Two-stage study with pre-qualification January–August 2006
1st place: Max Dudler, Zurich
2nd place: consortium Annette Gigon / Mike Guyer Architekten and David Chipperfield Architects, Berlin Timeline
Planning/implementation: 2007–2013
Draft project: March–October 2007 B
uilding application: September 2008
Beginning of construction: May 2010
Completion: February 2013
Planning/Implementation Planning committee
Max Dudler Gigon/Guyer David Chipperfield (as general planner until TU Submission)

29_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

Credits:
General Contractor: Implenia Schweiz AG, Dietlikon
Project Management: Mark van Kleef, deputy manager Daniel Hövels (Max Dudler’s office)

Landscape architects: Schweingruber Zulauf Landschaftsarchitekten, Zurich
Structural engineers: Leonhardt, Andrä und Partner Beratende Ingenieure VBI GmbH, Berlin
Dr. J. Grob & Partner AG, Winterthur
Electrical engineers: bürgin & keller management & engineering ag, Adliswil
Thomas Lüem + Partner AG, Dietikon
Building services: Polke, Ziege, von Moos AG Ingenieure für Gebäudetechnik, Zurich
Building physics/acoustics: Kopitsis Bauphysik AG, Wohlen
Fire protection engineers: Gruner AG Ingenieure und Planer, Zurich
Lighting Designers: matí AG Lichtgestaltung, Adliswil
Façade planning: gkp fassadentechnik ag, Aadorf
Security planning/Door Management: Amstein + Walthert AG, Zurich
Gastronomy planning: planbar ag, Zurich
Quantity surveyor and scheduling: Freiraum Baumanagement AG, Zurich (until TU Submission)

30_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

31_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

32_haus-freischuetzgasse_david-chipperfield-architects©stefan-müller_large

41_europaallee21_plg©stefan-müller_large

05_europaallee21_plg©stefan-müller_large

06_europaallee21_plg©stefan-müller_large

Md_gg_dca_ea21_zh_plaene-1_large

Md_gg_dca_ea21_zh_plaene-2_large

Md_gg_dca_ea21_zh_plaene-3_large

Md_gg_dca_ea21_zh_plaene-4_large

Md_gg_dca_ea21_zh_plaene-5_large

Md_gg_dca_ea21_zh_plaene-6_large

Md_gg_dca_ea21_zh_plaene-9_large

Md_gg_dca_ea21_zh_plaene-12_large

Md_gg_dca_ea21_zh_plaene-16_large


Viewing all articles
Browse latest Browse all 1949

Trending Articles