A building consisting of parts built at different times set in a rural complex with a courtyard, takes on a harmonious contemporary character. The reconstruction process begins with the demolition of damaged parts like the wooden floors and woodwork. New floors are placed between existing load- bearing walls at different levels so as to permit direct horizontal and vertical movement, from one room to another, through apertures in the walls. The division into three similar floors in the original building is substituted by a set of independent rooms each placed at a specific level.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Pino Brioschi . Published on March 22, 2013.
© Architetti Pedrozzi e Diaz Saravia . Published on March 22, 2013.
© Architetti Pedrozzi e Diaz Saravia . Published on March 22, 2013.
© Architetti Pedrozzi e Diaz Saravia . Published on March 22, 2013.
© Architetti Pedrozzi e Diaz Saravia . Published on March 22, 2013.